This is structural work with site-dependent foundation and house-connection design.
Project library / Structures
Attached Deck Planner
A planning walkthrough for a post-and-beam timber deck attached to a house, with railing and steps.

What makes this build.
This is structural work with site-dependent foundation and house-connection design.
The archive illustrates rails, integrated benches and steps as options.
Points to resolve before building
- Archival spans, post burial, cantilever and railing instructions are not verified for current use.
Materials & tools.
Check what you have, then confirm stock sizes and hardware against your chosen dimensions.
Materials checklist
Tools & operations
- Survey/layout tools
- Level
- Saw
- Drill
Tool choices may include practical editorial suggestions. Use workholding and guarding appropriate to the actual machine and operation.
Choose dry, sound stock and test unfamiliar joints in scrap. Keep guards, push aids, eye protection, and dust control appropriate to the work.
Measurements to know.
Selected dimensions verified from the source. This is not an automatically scaled cutting list.
Use the original drawing.
The source does not provide a complete, confidently readable set of dimensions here. Confirm the original drawing and develop a measured parts list before cutting.
Printed diagrams and concept images are not scale references. Verify measurements, material thickness, hardware fit, and allowances before cutting.
Inches to millimeters
Convert a measurement without changing the design. Enter a decimal or a fraction, such as 1 3/8.
Nominal lumber names and actual finished sizes are different. Converting units does not choose a substitute stock size.
Explore the construction.
Review stages explain the historical design and unresolved decisions; they are not approval to build or use it.
Survey the footprint
- Mark the proposed area with batterboards and compare diagonal measurements. Record door height, ground levels, drainage and access.
Resolve the house connection
- Have the existing wall structure and waterproofing assessed before choosing a ledger. Detail the flashing, fasteners and deck height as one system.
Design the foundations
- Establish soil bearing, frost depth, post locations and uplift requirements for the actual site. Do not substitute the source’s generic hole depths for this design.
Coordinate the frame
- Lay out beams, joists, blocking and connectors from a checked span/load design. Include lateral restraint and the effect of any cantilever.
Plan surface, guards and stairs
- Choose decking spacing from the actual product and moisture condition. Detail guard posts, stair geometry and landings before construction, then schedule required inspections.
Progress and notes stay in this browser. Nothing is uploaded.
Source notes.
- Original PDF
- Deck 1 .pdf
- Source length
- 5 pages
- Attribution
- Collection copyright 2004 Martian Auctions; original authorship unverified
- This edition
- 116 Studio · Original written companion and AI concept image · November 2026
Page references count from the first page of this PDF. The original is retained in the owner’s private woodworking collection; it is not distributed by this website. Consult it for full drawings, templates, and details beyond this companion.
Historical plans can omit essential context. Source references identify where a detail came from; they do not certify the design or replace current manufacturer instructions or applicable professional review.