The source is one drawing sheet with dovetailed casework and shaped details.
Project library / Storage & cabinets
Vineyard Wall Cupboard
A shallow bird’s-eye maple wall cupboard with two paneled doors and a small ledged shelf below.

What makes this build.
Dovetailed casework and shaped door details must be developed from a single measured drawing rather than a full build sequence.
A shallow open ledged shelf sits under the two doors.
Points to resolve before building
- No complete assembly or mounting specification is supplied.
Materials & tools.
Check what you have, then confirm stock sizes and hardware against your chosen dimensions.
Materials checklist
Tools & operations
- Saw
- Router
- Chisels
- Drill
- Clamps
Tool choices may include practical editorial suggestions. Use workholding and guarding appropriate to the actual machine and operation.
Choose dry, sound stock and test unfamiliar joints in scrap. Keep guards, push aids, eye protection, and dust control appropriate to the work.
Measurements to know.
Selected dimensions verified from the source. This is not an automatically scaled cutting list.
| Top | ¾ × 10½ × 35¼ in | Source p. 1 |
|---|---|---|
| Side blanks | ¾ × 7 × 26⅝ in | Source p. 1 |
Printed diagrams and concept images are not scale references. Verify measurements, material thickness, hardware fit, and allowances before cutting.
Inches to millimeters
Convert a measurement without changing the design. Enter a decimal or a fraction, such as 1 3/8.
Nominal lumber names and actual finished sizes are different. Converting units does not choose a substitute stock size.
Explore the construction.
Review stages explain the historical design and unresolved decisions; they are not approval to build or use it.
Read the measured drawing
- Create a joint and hardware schedule from the single sheet before cutting. Keep the cupboard’s shallow depth and projecting top distinct.
Fit the carcass joints
- Make the side-to-top dovetail detail and shelf housings shown in the section. Cut the shaped lower side ends from a paired template.
Build the door frame
- Join the stiles and rails around the center stile, then fit the two framed panels with movement allowance.
Add backs and molding
- Fit the beaded boards and hanging strip, then the layered top molding and lower shelf ledge.
Plan the installation
- Fit hinges and pulls, finish the wood and design wall fixings for the loaded cupboard and actual wall construction.
Progress and notes stay in this browser. Nothing is uploaded.
Source notes.
- Original PDF
- Cupboard.pdf
- Source length
- 1 pages
- Attribution
- Martha’s Vineyard Cupboard; authorship not visible on supplied sheet.
- This edition
- 116 Studio · Original written companion and AI concept image · November 2026
Page references count from the first page of this PDF. The original is retained in the owner’s private woodworking collection; it is not distributed by this website. Consult it for full drawings, templates, and details beyond this companion.
Historical plans can omit essential context. Source references identify where a detail came from; they do not certify the design or replace current manufacturer instructions or applicable professional review.