This is a photograph and maker’s note, not a construction plan.
Project library / Storage & cabinets
Grandfather Curio Clock
A tall narrow oak display cabinet combining a clock face, glass sides and adjustable shelves.

What makes this build.
The tall narrow glazed case needs complete joinery, hardware and stability design beyond the photographs.
The maker added original scrollwork and adjustable shelves.
Points to resolve before building
- No joinery, glass thickness, movement layout or load specification is supplied.
Materials & tools.
Check what you have, then confirm stock sizes and hardware against your chosen dimensions.
Materials checklist
Tools & operations
- Measuring and drawing tools
Tool choices may include practical editorial suggestions. Use workholding and guarding appropriate to the actual machine and operation.
Choose dry, sound stock and test unfamiliar joints in scrap. Keep guards, push aids, eye protection, and dust control appropriate to the work.
Measurements to know.
Selected dimensions verified from the source. This is not an automatically scaled cutting list.
| Reported overall | 6 ft tall × 12¾ in wide × 14¼ in deep | Source p. 1 |
|---|
Printed diagrams and concept images are not scale references. Verify measurements, material thickness, hardware fit, and allowances before cutting.
Inches to millimeters
Convert a measurement without changing the design. Enter a decimal or a fraction, such as 1 3/8.
Nominal lumber names and actual finished sizes are different. Converting units does not choose a substitute stock size.
Explore the construction.
Review stages explain the historical design and unresolved decisions; they are not approval to build or use it.
Record the design
- Use the two photographs to identify the tall glazed body, clock head, shaped top and base. Preserve the supplied measurements as reported, not a verified cutting list.
Choose clock components
- Select a current movement and dial, then establish their mounting and service clearances.
Design the glazed case
- Specify door joinery, glass retention and adjustable shelf supports for the chosen load.
Resolve stability
- Design the base, case connections and wall restraint for the very tall narrow footprint.
Prepare actual build plans
- Create a checked cutting list and assembly sequence before any woodworking. The supplied note is a project showcase, not those plans.
Progress and notes stay in this browser. Nothing is uploaded.
Source notes.
- Original PDF
- Granfather Clock Curio.pdf
- Source length
- 1 pages
- Attribution
- Unidentified maker’s Grandfather Clock Curio project note, Christmas 2001.
- This edition
- 116 Studio · Original written companion and AI concept image · November 2026
Page references count from the first page of this PDF. The original is retained in the owner’s private woodworking collection; it is not distributed by this website. Consult it for full drawings, templates, and details beyond this companion.
Historical plans can omit essential context. Source references identify where a detail came from; they do not certify the design or replace current manufacturer instructions or applicable professional review.